There will be a temporary road closure Woods Corner/Earlsdown on 08.01.20, between 7pm and 6am (one night), for high friction surfacing. A suitable diversion will be signed on site.
Click on the link below for map and details on the ESCC Highways website
https://www.eastsussexhighways.com/highway-schemes/earls-down-dallington-hfs